Some Ideas on Termite Control Technician Job Description You Need To

A Biased View of Termite Control Techniques


Many new buildings use a termicide treated layer of soil surrounding and under the building. This forms an integrated barrier, along with the physical techniques discussed above. The termicide is applied to the soil under the slab and around the footings, pipes, conduits and other structures of the home during construction to make a vertical barrier.

Timber used to construct houses, outbuildings, fences and other outdoor structures can be treated with chemicals. These are commonly referred toas treated timbers and should be considered in the time of designing or constructing the buildings.

The 3-Minute Rule for Termite Control Technician Job Description


To successfully incorporate termite barriers into existing buildings, strategic drilling through concrete slabs, porches, floors and wall footings may be needed, in addition to under ground treatment.

Building and Energy recommends only licensed pest controllers execute this work. Chemical baits Strategically put bait stations can be employed to lure termites into a food supply, such as dry wood or paper refuse. About 30 bait stations are needed for a normal house and they need to be inspected often to evaluate termite activity. .

Once the termites are attracted to the bait station, a specific termicide is inserted that sticks to the termite.

Termite Control Tenting for Dummies


To deal with termites in the garden, specialised pest managers drill into timber or the trunk of a tree to insert temperature probes which help locate the termite nest.  Despite routine inspections of this garden, termites may still enter the house. In the house, first indicator may be a slight discolouration of a wall , followed by warping if wood panelling is used to line the wall.

Make time to investigate the dimensions and nature of the issue in addition to the options offered for termite eradication. .

Whichever system you choose, it's important to do regular inspections in particular inspect your property every six months for any apparent signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once a year to look for signs of infestation and also to undertake any preventative steps. .

Getting My Termite Control Technician Job Description To Work


For existing buildings, in which you've found signs of infestation, chemical treatment is typically the only option for destroying the termite nest. This treatment can include re-establishing a compound and/or physical barrier plus regular inspections to discover any ongoing or new termite action.

Treatment with a termicide into tunnels of this nest where termites are known to be more active can reduce numbers, but it seldom eliminates the colony altogether unless it's used in conjunction with another method.

Some Of Termite Control Tenting


When buying an existing home, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to make sure the residence is free of termites and there is no structural damage from any prior infestation. A separate fact sheet concerning the need for wood pest inspections and reports when buying property can be found from the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you are constructing a new house or building or renovating an existing one you will need to comply with the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In most situations a building permit will be needed prior to carrying out building work and the facts of the type of termite barrier are to web link be submitted as part of this building permit application procedure.

Termite Control Tenting for BeginnersSome Known Details About Termite Control Tenting

Everything about Termite Control Tenting


The NCC requirements intention to reduce the risk of termite damage to main building elements which are mainly the structural elements of a building butdo not include non-structural elements such as cabinet work and furniture.

It's a requirement of the NCC that a lasting notice be permanently fixed to the building in a prominent location, such as in a tube or the like. The notice should indicate the type and method of termite risk management and the date that the system was installed, along with the installers or manufacturers recommendations for the scope and frequency of future inspections.

For specific information about termite protection for a proposed new home, contact a building surveyor, a builder or builder or a licensed pest control professional.

Some Known Questions About Termite Control Technician Job Description.


If you've had building work carried out in the past six decades and the builder did not offer termite protection as required from the NCC, you can refer the matter to the Building and Energy.

Plumbing leaks, drainage issues and roof leaks should be dealt with quickly, as damp conditions attract termites.

An Unbiased View of Termite Control Technician Job DescriptionUnknown Facts About Termite Control Techniques

The Definitive Guide to Termite Control Tenting


Garden beds and plants must be stored away from direct contact with walls. Hard paving should be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *